Found 7 results

Water removed from downstream base of No.2 Dam, Mangahao, 1936

Printed on front of photo, bottom – 21:2:36 28.

Stamped on back with black ink – 1 x 8

Water removed from downstream base of No.2 Dam, Mangahao, 1936. Tempory gravel dam below No.2 Dam with water pumped out giving access to base of dam for repairs. Pump on bank with flume to carry the water futher downstream. Man at water-edge handling a length of pipe.

See also – Acc.#2000.566.0019 identical photo.

Any use of this image must be accompanied by the credit “Horowhenua Historical Society Inc.”

Preparing for repairs downstream of No.2 Dam, Mangahao, 1936

Printed on front of photo, bottom – 15:2:36 26.

Stamped on back with black ink – 1 17

Preparing for repairs downstream of No.2 Dam, Mangahao, 1936. Water at base of dam (downstream side) needs to be removed before repairs can be started. Pump being prepared for use with flume (foreground). Exit of by-pass tunnel, just visible in shadow.

See also – Acc.#2000.566.0032 identical photo.

Any use of this image must be accompanied by the credit “Horowhenua Historical Society Inc.”

Water level next day, downstream of No.2 Dam, Mangahao, 1936

Printed on front of photo, bottom – 16:2:36 27.

Stamped on back with black ink – 1 x 8

Water level next day, downstream of No.2 Dam, Mangahao, 1936. Water pumping underway, with the water level lower compared to 2004.001.0016 (same view). Pump covered with flume (foreground). Exit of by-pass tunnel, clearly visible.

See also – Acc.#2000.566.0031 identical photo.

Any use of this image must be accompanied by the credit “Horowhenua Historical Society Inc.”

Search settings