https://d28dhd8eubcyz4.cloudfront.net/iiif/2/curtis-production2-cache%2F6210%2Fc%2Fc%2F67bedc-5984-448f-8f7c-93503def2b7e%2Fresize_master_d8ba8a293b5bc77f94df6790565572c1.jpg/full/!880,1024/0/default.jpg?sig=02b4f1e87d81b4b38cc4c90a17fb841c4dbd09ad&ver=1580150709
Preparing for repairs downstream of No.2 Dam, Mangahao, 1936
Momo rauemi:Image
- Description
Printed on front of photo, bottom – 15:2:36 26.
Stamped on back with black ink – 1 17
Preparing for repairs downstream of No.2 Dam, Mangahao, 1936. Water at base of dam (downstream side) needs to be removed before repairs can be started. Pump being prepared for use with flume (foreground). Exit of by-pass tunnel, just visible in shadow.
See also – Acc.#2000.566.0032 identical photo.
Any use of this image must be accompanied by the credit “Horowhenua Historical Society Inc.”
Tautuhi
Pūnaha whakarōpū
- Tūtohu Hapori