Shown here is the method of construction of the buttressing and retaining walls. The concrete from a mixer on the banks on the left is carried to the top of the tower in an elevator bucket and discharged by a chute into the boxing of the upstream wall. The chute on the left leads down to the foundations of the downstream wall. Photo: G L Adkin Collection.
https://d28dhd8eubcyz4.cloudfront.net/iiif/2/curtis-production2-cache%2F6210%2F2%2F2%2F7137ee-c827-4e2b-97dc-0b9f96b87f61%2Fresize_master_858ef9bdd24464b29890ce34b85778c0.jpg/full/!880,1024/0/default.jpg?sig=375b0b6a0b6f0a6bf0e468404e75af03f8251f76&ver=1580150815
Method of construction Mangahao Dam
Object type:Image
Identification
- Object type
- Image
Creation
- Created By
- Unknown
Object rights
Taxonomy
- Community Tags