
Method of construction Mangahao Dam
Object type:Image
- Description
Shown here is the method of construction of the buttressing and retaining walls. The concrete from a mixer on the banks on the left is carried to the top of the tower in an elevator bucket and discharged by a chute into the boxing of the upstream wall. The chute on the left leads down to the foundations of the downstream wall. Photo: G L Adkin Collection.
Identification
Creation
- Created By
- Unknown
Object rights
Taxonomy
- Community Tags